The Glitch

Overview: An installer is asked to provide a system that supplies two zones of fin-tube baseboard and two zones of floor heating. The system also supplies domestic water heating.

He selects a mod/con boiler because it’s lighter than a conventional boiler, and pipes it as shown in Figure 1. The primary circulator runs when any of the space heating zones call for heat.

Exercise: Can you spot at least five errors in how this system is configured?


The Fix

Although a mod/con boiler can be used in this type of system, it will operate at elevated temperatures (depending on the load supplied by the baseboards versus that supplied by the low temperature zones). Under partial load conditions, the boiler’s inlet water temperature may be low enough to allow some condensing mode operation.

Although the installer’s intention was to create a “primary loop,” that’s not what he ended up with. The two high-temperature zones are piped across the loop rather than into pairs of closely spaced tees. The “primary circulator” will also induce hot water migration into the higher temperature zones due to the head loss around the remainder of the “primary loop.”

Another problem is the lack of a thermal trap, or check valve to stop heat migration through the injection risers when the injection pump is off, but the “primary circulator” is operating. Although the drop leg in the piping might constitute a “trap” of sorts, it will not stop heat migration into the injection risers.

There is no need to create a primary loop in this system. Provided the headers are relatively short and generously sized (flow velocity less than 4 feet per second with all circulators running), the injection pump can be piped across the headers as shown in the fix drawing. However, be sure that a check valve is used in the injection circulator.

There should also be purging valves on the return side of all zone circuits, and these valve need to be installed in the correct orientation. The glitch drawing shows them upside down on the return side of the high temperature zones.

There is no air separator in the glitch drawing. The fix drawing shows the air separator installed, so flow leaving the boiler passes through it in both space heating and domestic water heating modes.

The boiler’s supply temperature sensor is mounted too close the closely spaced tees. In this position, the mixing between the incoming boiler water and system bypass water is not complete, and the temperature has not settled to the final blended value supplied to the distribution system. Ditto for the supply sensor of the injection mixing controller. The controls will respond to incorrect temperatures.

There is no need for the injection mixing controller to sense boiler return temperature with a condensing capable boiler.

Finally, a ball valve is not a good choice for balancing the return injection riser. A globe valve or other valve specifically intended for balancing should be used.


John Siegenthaler, P.E.
john@hydronicpros.com
John Siegenthaler, P.E., is principal of Appropriate Designs, a consulting engineering firm in Holland Patent, N.Y., and author of the text “Modern Hydronic Heating.” Visit www.hydronicpros.com for information on new software for hydronic system design and documentation. John is also the contributing editor to PM's monthly "The Glitch & The Fix" column, which offers hydronic troubleshooting solutions in conjuction with the magazine's twice-monthly Radiant & Hydronics eNews newsletter. You can reach John by e-mail at john@hydronicpros.com.

Links

  Comments (0)Post a Comment
 

No HTML or BBCode in comments please.
 


PMmag.com

Visit Plumbing & Mechanical website.


PMEngineer.com

Visit PM Engineer website.


SupplyHT.com

Visit Supply House Times website.


ReevesJournal.com

Visit Reeves Journal website.


Bath and Kitchen Pro

Visit Bath & Kitchen Pro website.


RadiantandHydronics.com

Visit Radiant & Hydronics website.


Radiant + Hydronics eNews
Click the button below to sign up for the Radiant + Hydronics eNews.


Bath & Kitchen Pro eNews
Click the button below to sign up for the Bath & Kitchen Pro eNews.


PVF E-News
Click the button below to sign up for the PVF E-News.


PME E-News
Click the button below to sign up for one of PME's free E-Newsletters.














Water Quality Association
Want to know more about water? Then look no further than WQA's Water Information Library - a new cross-industry database of information consisting of articles from the top industry publications as well as WQA's own extensive technical papers and resources.


College of Product Knowledge CD by Don ArnoldCollege of Product Knowledge CD by Don Arnold

Invest in the best-read series ever published for the Plumbing Industry & the most highly acclaimed product training CD. Knowledge is an investment
Click Here




home   |    latest news   |     calendar   |    blog   |    buyers guides   |    media kits   |     RJ's Tool Bin   |     store   |    contact   |    links